Post by sarahnulks on May 5, 2021 2:30:02 GMT
Proper planning and scheduling is very essential in projects for sinking and scheming delays of the project. Extensive amounts of time, money, resources are wasted each year in a construction industry due to improper planning and scheduling. With globalization the construction projects have become infinite and complex. Planning of such projects requires huge amount of documentation work, which can be reduced with the help of project planning software. These study are to plan, schedule, and track a residential project with help of primavera software, study the results generated, it is possible to propose which method is suitable for the chosen residential project.
|
|
|
Post by georgemacky on Dec 17, 2021 5:19:46 GMT
A project’s lifecycle consists of 5 steps: Initiation, Planning, Execution, Monitoring and Control, and Closing. Each step is crucial for project success and to achieve the goal of the project scope. However, a planning engineer mainly uses primavera P6 for the Planning, Monitoring, and Controlling project schedule and resources.
|
|